Saturday, July 27
Shadow

First Amrit Bharat Express Train Will Connect These Cities

The first Amrit Bharat Express train is likely to be launched the next week by PM Modi. Check out the Amrit Bharat Express route, speed, fare, train number and start date.

The first Amrit Bharat Express Train is likely to launch on 30 December 2023.
The first Amrit Bharat Express Train is likely to launch on 30 December 2023.

Amrit Bharat Express train is a low-priced superfast train which is going to start in India for the first time. The manufucturing cost of the Amrit Bharat train is comparatively very low as compared to other superfast trains in India. Amrit Bharat Express will have only class, non AC sleeper and Unreserved Class. Amrit Bharat Express is manufactured by Chittaranjan Locomotive Works which is located in Asansol in West Bengal.

First Amrit Bharat Express Train Route

The first Amrit Bharat Express route will cover a distance of 1176 km between Darbhanga and New Delhi. The First Amrit Bharat Express route will connect three Indian states Bihar, Uttar Pradesh and New Delhi. The Indian railway has planned to start the first Amrit Bharat Express between Darbhanga and New Delhi because the number of passengers on this route is very high and their paying capacity is comparatively low.

First Amrit Bharat Express Train Speed

Amrit Bharat Express can run at a top speed of 160 km/h, but due to poor rail track conditions train will run at the maximum speed of 110–130 km/h.

First Amrit Bharat Express Train Ticket Price

The ticket price for first Amrit Bharat Express between Darbhanga and New Delhi will be 580 Rupees in Non AC sleeper class and 300 Rupees in the Unreserved Class. The train will have 22 coaches and it can carry around 1800 people at the same time.

First Amrit Bharat Express Train Facilities

  1. Amrit Bharat Express consists of 22 coaches, of which 12 coaches are Non-AC Sleeper Class (SL), 8 General Unreserved Class (GS/UR) and 2 Luggage Coaches (EOGs).
  2. Every coaches are connect in way so that it will give less noise and less vibration during travelling.
  3. First Amrit Bharat Express is equipped with CCTV for passenger security and safety.
  4. First Amrit Bharat Express Train have bio-vacuum toilets and sensor-based water taps.
  5. Amrit Bharat Express is the first Unreserved Indian train which will have a passenger information system and electric outlets.

First Amrit Bharat Express Train Start Date?

According to the sources, the first Amrit Bharat Express will start on 30 December 2023 between Darbhanga and New Delhi.

Keep visiting The Ganga Times for such beautiful articles. Follow us on FacebookTwitterInstagram, and Koo for regular updates.

%d bloggers like this: